Townhome Bathroom

Our team was tasked with a couple of challenges on this bathroom project.  First off, this is the only bathroom in the home, so keeping the toilet functional during the project was of paramount importance.  Second, our client had recently had the floor re-tiled, which meant that we needed to design the other finishes around the floor, as well as keep the floor protected during the rest of the construction.

The new vanity looks sharp in a modern style.  The tub/shower was removed in favor of a large shower, meaning our client doesn’t need to climb over a tub to use the shower.  New fixtures and a fresh coat of paint complete the project.  We are happy to report that the floor made it through the project without being damaged!

Designer:  Chris Albrecht